Uncertified WIP: The Work You’ve Done But Can’t Turn Into Cash

You are busy. The order book is full, the sites are live, and the P&L says you are profitable. So why is the bank account always tight, and why does payroll feel like a monthly escape?

For a lot of UAE contractors, the answer is sitting on the balance sheet under a line most owners never look at twice: work in progress. More precisely, the part of it that nobody has certified yet. You have done the work. You have paid for it — subcontractors, labour, materials, plant. But the engineer has not valued it, the interim payment certificate has not caught up, and so the client has not paid. That gap between cost incurred and cash collected is uncertified WIP, and on a growing project it quietly swallows every dirham you earn.

This is not a niche accounting problem. It is the number-one reason a profitable contractor runs out of cash.

The market is making it worse right now

Payment delays across the UAE are getting longer, not shorter. In Atradius’s 2026 UAE B2B Payment Practices Barometer (published August 2026), credit sales now make up around 47% of all B2B transactions, and roughly two in five invoices are paid late. The report singles out industrial and construction businesses as the most affected, because of the long, certificate-driven payment cycles the sector runs on. Nearly half of the firms surveyed expect default risk to rise further.

2 in 5 UAE B2B invoices are paid late (Atradius, 2026) — and construction, with its valuation-and-certificate payment chain, sits at the sharp end of that number.

Translate that into site reality. Every month you finish you are carrying work that is weeks — sometimes months — away from being certified and paid. The longer the certification cycle stretches, the more of your own cash is tied up in work you have already delivered. That tied-up cash has a name on the balance sheet, and understanding exactly what it is changes how you manage it.

What uncertified WIP actually is (and isn’t)

When you incur cost on a contract and the revenue for that work has been earned but not yet billed or certified, accounting standards (IFRS 15) let you recognise a contract asset — commonly carried as uncertified WIP. In plain terms: the standard agrees that the client owes you for this, even though no certificate has been issued yet, so you can show it as something of value you are holding.

But there is a condition that matters enormously, and it is where a lot of contractors quietly get into trouble. A cost only belongs in WIP as an asset while two things are true: the work has been done but not yet certified, and recovery is still genuinely expected. IFRS 15 treats a contract asset as recoverable only when collection is highly probable.

The moment you accept you will not get paid for a cost, it stops being an asset. It drops straight through to cost of sales and eats your margin. That is a profit loss — not a balance-sheet number you can keep carrying.

Here is the failure mode we see again and again. A contractor keeps piling incurred cost into project WIP — variations done on instruction but never priced, a disruption cost never formally claimed, measured work the engineer keeps disputing — and carries it optimistically, month after month, as though it will all come good. On paper the project still looks profitable. In reality, part of that WIP is never going to convert to cash. When it is finally written off, the “profit” you reported for a year turns out to have been a loan you were making to the client, interest-free, that is now simply gone.

So uncertified WIP splits into two very different things wearing the same costume: genuine contract assets that just need to be certified and collected, and dressed-up losses that should already have been claimed or written off. Telling them apart is the whole game.

Why it drains the business — the connected view

At APM we keep coming back to one idea: a contractor doesn’t have five separate problems. They have one connected system. Uncertified WIP is the clearest place to see it, because it sits right at the joint between cost and cash — and what happens there flows all the way through to how much the bank will lend you.

Where uncertified WIP bites the system
Contract→ Commercial Control→ Cost & Margin→ Cash Flow→ Funding→ Banking Capacity→ Growth

Follow the chain. Cost is incurred on site. If commercial control is weak, that cost never gets properly valued, certified and billed — so it stalls as WIP instead of becoming cash. With cash stuck in WIP, you fund the gap yourself: from your own reserves first, then from the bank. That pushes up your funding need exactly when your collections look slow — and a bank reading your accounts sees swelling receivables and WIP, thin operating cash flow, and rising short-term borrowing. That is the profile that caps your banking capacity and, eventually, stops you bidding the next job. The problem that started as an uncertified valuation ends as a growth ceiling.

Cost out
Paid: subbies, labour, plant
No cert
Engineer hasn’t valued it
Cash in?
Not until certified & paid

An illustrative example

The following is a simplified illustration, not a real client. Say you run three live projects and, across them, you are carrying AED 6M of WIP. On paper, fine — it is an asset. But when you break it down honestly: AED 4M is genuinely certifiable work just caught behind the next valuation cycle; AED 1.5M is variations you were instructed to do but never formally priced and submitted; and AED 0.5M is a disruption cost from an employer delay that you have grumbled about but never actually claimed under the contract.

Only the AED 4M is a real, bankable asset. The AED 2M is at risk — and until you either claim it properly or face it as a loss, your accounts are overstating both your profit and your financial strength. Worse, you are financing all AED 6M out of your own working capital while the clock runs. The fix is not accounting cleverness; it is commercial discipline: price and submit the variations, serve the notice and build the disruption claim, and chase the valuation cycle so the certifiable AED 4M actually turns into cash.

How to get your WIP under control

  1. Separate real assets from dressed-up losses. Go through WIP line by line. Mark each item as certifiable-and-collectable, claimable-but-not-yet-submitted, or unrecoverable. You cannot manage a number you have never broken down.
  2. Attack the certification cycle. Most uncertified WIP is simply work waiting on the next valuation. Submit on time, submit complete, and push for certification under the contract’s timeline rather than drifting with the engineer’s.
  3. Turn instructed work into priced claims. Variations and disruption costs are not WIP that will magically settle — they are entitlements you have to formally establish, with notice and quantum, before they become collectable.
  4. Face the unrecoverable early. A cost you will not recover is a loss today, not next year. Recognising it early is painful but it stops you reporting phantom profit and making decisions on numbers that aren’t real.
  5. Forecast cash off WIP, not off the P&L. A profitable project with ballooning WIP can still fail to make payroll. Run a rolling cash forecast that tracks when WIP actually converts to certified cash.

Do this well and the effect is not just cleaner books. It is more cash in the account, a stronger-looking balance sheet, and a credit profile that lets the bank support your next project instead of pulling back from it. That is the whole connected system working in your favour instead of against you.

Is your margin trapped in uncertified WIP?

We help UAE contractors turn stalled work-in-progress back into certified cash — and build the balance sheet your bank wants to lend against.

Book a Finance & Commercial Review →

CA. Binod Chapagai is a Chartered Accountant and Virtual CFO and the founder of APM Business Consultancy (Accureon Power Management Consultancies L.L.C., Dubai). APM provides finance, funding and commercial advisory to UAE contractors — with a track record of building bank facilities from AED 14M to AED 101M and arranging over AED 390M in project financing. Dubai, UAE · +971 52 315 6149 · info@accureonpower.com

Similar Posts

Leave a Reply

Your email address will not be published. Required fields are marked *